Civil contractors: contract works requirements in Australia
Cover for the works under construction, materials and sometimes existing structures for the duration of a contract.
Data as at
In short
- Contract works insures the civil works while they are being built, with materials on site, for the period of the project.
- Principal-supplied contracts usually say who arranges it, so the insurance clause is the first thing to read.
- Public liability does not cover damage to the works themselves.
Roads, drainage, subdivisions and utilities work usually runs under contracts the principal has written. Those contracts set the insurance terms, often more precisely than any licence would.
Contract works looks inward at the works, and liability looks outward at what they damaged.
What contracts commonly ask for
Principals and head contractors set their own insurance requirements, and those are frequently higher than a licence condition. The requirement that binds is the higher of the two, and both have to be read from the actual document.
What this cover costs
This site publishes no cost benchmark for this cover. A benchmark needs a real sample of documents, and none is published until the sample is large enough to compute a median honestly. A benchmark from a handful of policies is a guess with a decimal point.
Do I have to have it?
The facts recorded for this cover show no state licence condition attached to it, so no regulator is the reason to hold it here. What decides it is the contract. On larger projects a principal may take out a single policy covering everyone working on the site.
What does it actually cover in my work?
These are illustrations of what the cover is for. Whether a policy responds depends on its wording.
Contract works insures the works while they are being built, along with materials on site and often existing structures being worked on.
- Drainage you have laid is washed out by a storm before handover.
- Materials stockpiled for a subdivision stage are damaged or stolen.
- Works in progress are damaged by a vehicle before the contract is complete.
What isn't covered, and what covers it instead?
Public liability covers injury and damage to property belonging to others, not the works being built. Plant is usually covered separately.
Where a principal arranges the policy, which one applies changes who can claim and who bears the excess.
What will a client or principal ask for?
Principals commonly ask for a certificate of currency and may check that the insured name matches the contracting entity. If they arrange the cover, subcontractors are commonly named or covered, and a waiver of subrogation prevents recovery from them afterwards.
What to have ready
A licensed broker or insurer can help you check the detail for your projects.
- The contract opened at the insurance clause
- Whether the principal arranges one policy for the project
- The sum insured following contract value as the job proceeds
- Cover through the defects liability period
- A certificate of currency in the right entity name
Questions
- Do I need contract works as well as public liability?
- They cover different things. Contracts commonly require both, and the contract says which.
- What is a waiver of subrogation?
- It is the clause that stops the insurer recovering from subcontractors after paying a claim.
Sources
- Moneysmart (ASIC) — General guidance on business insurance from the regulator’s consumer site. A starting point, not a definition of this cover.
- Insurance Contracts Act 1984 (Cth) — Federal Register of Legislation — The statute governing how insurance contracts operate in Australia, including the duty owed when taking out cover.