Insurables — Australian business risk, sourced and dated

Shopfitters: contract works requirements in Australia

Cover for the works under construction, materials and sometimes existing structures for the duration of a contract.

Data as at

In short

  • Contract works insures the fit-out while you are installing it, and often the existing tenancy structure you are working on.
  • A landlord's conditions often set who must arrange the cover, so read them before you start.
  • Public liability does not cover damage to the fit-out itself.

Fit-out work usually happens inside a landlord's building, to the landlord's conditions. That makes the insurance clause in the tenancy documents and your contract the place to start.

The cover looks inward at the works, while liability looks outward at what the work damaged.

What contracts commonly ask for

Principals and head contractors set their own insurance requirements, and those are frequently higher than a licence condition. The requirement that binds is the higher of the two, and both have to be read from the actual document.

What this cover costs

This site publishes no cost benchmark for this cover. A benchmark needs a real sample of documents, and none is published until the sample is large enough to compute a median honestly. A benchmark from a handful of policies is a guess with a decimal point.

Do I have to have it?

The facts recorded for this cover show no state licence condition attached to it, so no regulator is the reason to hold it here. What decides it is the contract and, for tenancy work, the landlord's conditions. The clause you are asked to sign shows what applies.

What does it actually cover in my work?

These are illustrations of what the cover is for. Whether a policy responds depends on its wording.

Contract works insures the works while they are being built, along with materials on site and often existing structures being worked on.

  • A half-finished fit-out is damaged by fire before the tenant opens.
  • Joinery and fittings waiting to be installed are damaged on site.
  • Existing structure within the tenancy is damaged during the fit-out, which the cover often takes in where the job is a renovation.

What isn't covered, and what covers it instead?

Public liability covers injury and damage to property belonging to others, not the works being built. Plant is usually written separately and tools of trade separately again.

Check whether the principal has arranged one policy for the project, because that changes who claims and who bears the excess.

What will a client or principal ask for?

A landlord or head contractor may ask for a certificate of currency, with the insured name matching the contracting entity. Where a principal arranges the cover, subcontractors are commonly named or covered as insureds, and a waiver of subrogation stops the insurer recovering from them afterwards.

What to have ready

A licensed broker or insurer can help you check the detail for your projects.

  • The tenancy and fit-out documents opened at the insurance clause
  • Whether the principal or you arranges the cover
  • The sum insured set to completed contract value
  • A certificate of currency in the right entity name

Questions

Does it cover my tools on site?
Usually not as the main insured property. Mobile plant is generally written under plant and equipment, and hand tools under tools of trade.
Who is named as insured?
It depends on who arranges the policy. On larger projects a principal may arrange one policy for everyone on site.

Sources